Ignite FB Tracking Pixel97 Oswego River Road, Schroeppel, NY 13135 - Century 21 Winklhofer
Century 21 Winklhofer
Real estate listing preview #1Real estate listing preview #2Real estate listing preview #3Real estate listing preview #4Real estate listing preview #5Real estate listing preview #6Real estate listing preview #7Real estate listing preview #8Real estate listing preview #9Real estate listing preview #10Real estate listing preview #11Real estate listing preview #12Real estate listing preview #13Real estate listing preview #14Real estate listing preview #15Real estate listing preview #16Real estate listing preview #17Real estate listing preview #18Real estate listing preview #19Real estate listing preview #20Real estate listing preview #21Real estate listing preview #22Real estate listing preview #23Real estate listing preview #24Real estate listing preview #25Real estate listing preview #26Real estate listing preview #27Real estate listing preview #28Real estate listing preview #29Real estate listing preview #30Real estate listing preview #31Real estate listing preview #32Real estate listing preview #33Real estate listing preview #34
listing
1 of 34
LandFor Sale
$1,200,000
97 Oswego River Road
Schroeppel, NY 13135
Listed by: Adolfi Real Estate, Inc., 315-695-6434
MLS: New York State Alliance
1,992,434Sq Ft
Est. Mortgage
$6,294/mo

This property originally was to become a housing development with a marina and with a portion of lots being waterfront. The number of approved lots has changed through the years so please refer to the current zoning. There was a planned 60 Slip Marina with Excavation and Stone work begun (85% complete) Sub-base of roads complete. Partial Utility Infrastructure Complete. Partial Sanitary and Storm Sewer Infrastructure Complete. (Approximately 80-90% completed) There will be a cost to hook in. Public water: Another 200ft. Of high pressure waterline is needed to tie into the municipal water line which is 8” steel. There will be an extra cost to hook in. Wetland Delineation Substantially Complete. Engineering Completed Constructions Documents - consisting of a 70 page site plan with additional reports and plans. (A cost to obtain these plans if they are relevant - previous owner never owned the plans, engineer has them) There is a work around to allow more housing units to join beyond the sewer constraints of a certain number. Which is a ground mitigation system of 5 to 1 that reduces sewer water. All information documented here is subject to the buyers verification.

Get in touch
Information courtesy of Adolfi Real Estate, Inc. is subject to verification and is not guaranteed.
Community / School Information