This property originally was to become a housing development with a marina and with a portion of lots being waterfront. The number of approved lots has changed through the years so please refer to the current zoning. There was a planned 60 Slip Marina with Excavation and Stone work begun (85% complete) Sub-base of roads complete. Partial Utility Infrastructure Complete. Partial Sanitary and Storm Sewer Infrastructure Complete. (Approximately 80-90% completed) There will be a cost to hook in. Public water: Another 200ft. Of high pressure waterline is needed to tie into the municipal water line which is 8” steel. There will be an extra cost to hook in. Wetland Delineation Substantially Complete. Engineering Completed Constructions Documents - consisting of a 70 page site plan with additional reports and plans. (A cost to obtain these plans if they are relevant - previous owner never owned the plans, engineer has them) There is a work around to allow more housing units to join beyond the sewer constraints of a certain number. Which is a ground mitigation system of 5 to 1 that reduces sewer water. All information documented here is subject to the buyers verification.